CX-3T Air-lifted onto sluice gate headings for Shuttering
and Formwork duties at Cardiff Barrage |

CX-8T Afloat on the River Avon, a Starlifter CX-8T works
installing Interlocking sheet piling under the low bridge on the London
to East Coast railway bridge |

CX-8T Low Headroom operations
|
CX-8T Quick dispatch by truck |


CX-8T Working Underground on the Heathrow
Express project lifting 1 Tonne tunnel segments into position at a radius
of 6.5m with boom at 10m, from adjacent rail position |

CX-3T Two Starlifter's manoeuvre 3.5 tonne acrylic
panels into position providing safe viewing windows for tourists visiting
new aquaria in the basement at London’s old County Hall |

Rough Terrain operations. |

Low Headroom operations. |



View the Starlifter in action.
This movie is in 'vmv' format and can be viewed by Windows Media Player, if
you need to download the lastest player click
here
 |
Starlifter Crane opeations
3.7mb

|
|